Put the trough well away from the feed area, on the low side of the pen where overflow and cleaning water can run out to a lane or drain, on a raised pad, with enough firm standing around it that you can get to it in wet weather. Agriculture Victoria puts it simply: troughs in a stock containment area should be placed on a raised pad of gravel, stone or concrete to ensure good drainage and stability, and should be located away from feeding areas to minimise water contamination. The rest of this comes down to what that looks like on the ground.

Away from the feed, not beside it

The MLA feedlot design manual is blunt about it. Because cattle drink soon after feeding, water troughs should not be located relatively close to the feed troughs. After feeding, cattle hold grain on their muzzles and in their mouth for a time, and if the trough is too close to the feed bunk they transfer more grain across to the water, requiring more frequent cleaning.

The same logic applies to sheep in a containment pen. Agriculture Victoria notes that confined stock live in close proximity, can be exposed to increased levels of dust and mud, and are often on a more targeted diet than they would get in the paddock. Everything that goes in the feed trough is in the air and on the ground around it.

Why troughs near feed foul faster

Three things load up a trough sitting near the bunk:

  • Grain and feed carried across on muzzles, straight into the water.
  • Dust and straw blowing off the feed area and floating on the surface.
  • Heavy traffic, because stock move between feed and water in a tight loop.

Agriculture Victoria says stock avoid or reduce consumption of water that is warm, stagnant, polluted with food residues, or has dust or straw floating on the surface. Surface material should be skimmed off daily, and troughs should be completely emptied, cleaned and re-filled every 1 to 2 days. That is the baseline whatever you do. A trough beside the feed only pushes you past it.

MLA adds a second cost in that position: water flushed from the trough during cleaning, plus the heavy traffic, can cause rapid pen floor deterioration and multiple wear points, and a trough there will most likely need to be sewered.

Get the drain water out of the pen

MLA makes the case for the bottom fence line near the cattle lane or drain. From there, overflow, spillage and flushing water is conveyed directly out of the pen to the drainage system, and wet spots in the pen are avoided. Stock walking the perimeter also find the water easily, and the manual notes troughs there are likely to have less feed deposited.

Two warnings worth taking across to a containment pen. MLA says troughs should never be placed where they prevent drainage from the pen. And fence line troughs sitting right beside the lane gates can turn those high traffic areas into bogholes when flushing water is let go. A trough set back from the gate, draining to the low corner, avoids both.

If the trough has to sit mid pen, MLA expects a spoon drain or a sewer line running to a drainage point in the lane or gully. Whatever the position, the drainage outlet should be placed so water flows away from the trough, preferably to a drain.

Room to clean around it

MLA recommends a concrete apron at least 3 m wide all around the trough, which gives full access and carries the 2.4 m width of pen cleaning machinery, sloping a minimum of 2% away from the trough with a rough surface. Few containment areas get that much concrete, but the principle travels: firm, free draining standing on all sides, so you can walk around the trough and bring a vehicle alongside without churning mud.

Build the pad up level. MLA points out there would be 150 mm fall over a 5 m long trough in a pen with 3% slope, so the pad, not the trough, takes up the grade. Keep the sides closed in down to the pad as well, since open frames let manure pack in underneath where you cannot reach it.

Where a self-flushing trough goes

A flushing trough follows the same rules, with one extra thought: the drain outlet wants to point at the lane or low corner. SATURN is 2,225 mm long with 1,950 mm of drinking length and holds 50 litres, and each flush carries sediment out through its drain using about 60 litres (manufacturer figures). Where that water runs is worked out at installation, the same as any trough with a drain.

What we recommend

Walk the pen before you plumb anything. Pick the spot furthest practical from the feed, on the low side, draining clear of the gate and the pen floor, and give yourself standing room on all sides. If you want to see how a flushing trough handles your layout, try one on your own farm during our 3-month trial and watch where the water actually goes.

Sources
  • Agriculture Victoria, Water supply in stock containment areas (agriculture.vic.gov.au)
  • Meat & Livestock Australia, Feedlot design manual, chapter 20 Water trough design and sewer systems (2016)